We build 90% of a project in 10% of the time, but the last 10% to make it perfect takes the remaining 90% of the time. And sometimes it takes so long that we don’t even ship at all.
Issue 62- Perfect Is the Enemy of Good Enough
We build 90% of a project in 10% of the time, but the last 10% to make it perfect takes the remaining 90% of the time. And sometimes it takes so long that we don’t even ship at all.